Service desk
The service desk is the single point where events become tracked work, with an owner and a clock.
The service desk may provide:
- Ticket registration
- Classification
- Prioritisation
- Assignment
- Escalation
- Communication
- Closure
- Reporting
Commissioning is not the end of an ICT system’s lifecycle. After go-live we monitor infrastructure, manage incidents, perform preventive maintenance, control changes and maintain asset and configuration records throughout the operating period.

After go-live:
Our managed operations framework is designed to maintain performance throughout the system lifecycle. After go-live we maintain visibility across infrastructure, applications and devices through monitoring, incident management, preventive maintenance, configuration control, field support and lifecycle planning.
The framework includes:
Our role is to ensure that different technologies, vendors, applications, locations and operational teams function as one coherent system.
Nine processes make up the operating model. Each is defined before handover and documented in the runbooks the operations team receives.
The service desk is the single point where events become tracked work, with an owner and a clock.
The service desk may provide:
An incident is closed when service is restored and validated. Diagnosing why it happened is the job of problem management.
Incident management should focus on restoration of service. It should include:
Repeated incidents are treated as evidence of an underlying cause. Root-cause analysis ends in corrective and preventive action, and sometimes an engineering change.
Problem management should identify underlying causes of recurring incidents. It may include:
Every change to a running system follows the same path, so the configuration record stays true and failed changes can be reversed.
Changes should be:
Scheduled inspection and review find degradation — dust, failing cables, ageing firmware, shrinking capacity — before it causes an outage.
Preventive maintenance may include:

The asset record answers what is installed, where, in what configuration, under what support, and when it must be replaced.
Asset management should maintain:

Spares policy is derived from which failures would stop service and how long a replacement would take to reach site.
Spares management should define:
Dispatch decisions weigh severity against distance, access, safety and whether the right spare is on the vehicle.
Field support should be organised around:
Reports show how the system and the service are performing, and what is likely to need attention next.
Operational reporting may include:

Operations is also where lifecycle planning is done. Asset records carry end-of-life dates, preventive maintenance records show equipment approaching the end of its useful life, capacity reviews show where growth will exceed current design, and security update reviews show where software is falling out of support. Together they let upgrades and replacements be planned ahead of failure, and feed the next assessment in the engineering lifecycle.
Describe the systems, locations and support period, and we will respond with the questions that shape the operating model.